DESIGN, PROVIDING AND LAYING OF SURFACING WORKS INCLUDING CTB COVERED WITH SAMI LAYER OVER MECHANICALLY CHISELLED AND CLEANED CTB SURFACE DULY PRIMED WITH PRIME COAT AND BC (40 MM) IN ACCORDANCE WITH RELEVANT CLAUSES OF IRC37:2018 AND IRC-SP-89: (PART-II) 2018 BETWEEN KM 53.00 T0 KM 64.250 (PART-A) AND KM 64.250 TO KM 71.300 (PART-B) (HURI… Continue reading CA CE(P) ANK /12/2020-21
Category: Arunachal pradesh
CA CE(P) ANK /13/2020-21
DESIGN, PROVIDING AND LAYING OF SURFACING WORKS INCLUDING CTB COVERED WITH SAMI LAYER OVER MECHANICALLY CHISELLED AND CLEANED CTB SURFACE DULY PRIMED WITH PRIME COAT AND BC (40MM) IN ACCORDANCE WITH RELEVANT CLAUSES OF IRC37:2018 AND IRC-SP-89: (PART-II) 2018 BETWEEN KM 36.00 T0 KM 55.638 (NET LENGTH 14.20 KM) ON ROAD TAMA CHUNG CHUNG TO… Continue reading CA CE(P) ANK /13/2020-21
CA No. CE/ANK/10/2019-20
Design, providing and laying of surfacing works including preparation of sub-grade with cementitious sub-base (CTSB) and CTB covered with sami layer over mechanically chiseled and cleaned CTB surface duly primed with prime coat and BC (30MM) in accordance with relevant clauses of IRC 37:018 and IRC-SP-89: (Part-II) 2018 between km 5.00 to 8.00KM, Km 21.00… Continue reading CA No. CE/ANK/10/2019-20
CA CE (P)ANK/09/2019-20
DESIGN PROVIDING AND LAYING OF SURF WRK INCLUDING CTB COVRED WITH SAMI LAYER OVER MECALLY CHISELD CLEANED CTB SURFCE DULY PRIMED WITH PRIME COAT AND BC40MM IN WITH RELEVANT CLAUSE IRC37 2018 AD IRC SP 89PARTII 2018 AT KM 0T0 KM 16 TCC MAZA. IN THE STATE OF ARUNACHAL PRADESH