DESIGN PROVIDING AND LAYING OF SURF WRK INCLUDING CTB COVRED WITH SAMI LAYER OVER MECALLY CHISELD CLEANED CTB SURFCE DULY PRIMED WITH PRIME COAT AND BC40MM IN WITH RELEVANT CLAUSE IRC37 2018 AD IRC SP 89PARTII 2018 AT KM 0T0 KM 16 TCC MAZA. IN THE STATE OF ARUNACHAL PRADESH

CE (P) HIMANK/01/2022-23

PROVIDING LAYING AND COMPACTION OF 160 MM THICK CEMENTITIOUS BASE (CTB) OVER 150 MM GSB SURFACE, 10 MM THICK SAMI LAYER OVER PREPARED CTB LAYER IN ACCORDANCE WITH RELEVANT CLAUSES OF IRC 115-2014, IRC 37:2012/2018, IRC SP 89: (PART-II) 2010/2018, PROVIDING HMP READY MIX, LAYING BY PAVER AND COMPACTION OF 50 MM THICK DENSE BITUMINOUS… Continue reading CE (P) HIMANK/01/2022-23

CE (P) HIMANK/08/2020-21

PROVIDING LAYING AND COMPACTION OF 160 MM THICK CEMENTITIOUS BASE (CTB) OVER GSB SURFACE, 10 MM THICK SAMI LAYER OVER PREPARED CTB LAYER, PROVIDING HMP READY  MIX, LAYING BY PAVER AND COMPACTION OF 50 MM THICK DENSE  BITUMINOUS MACADAM, 40 MM THICK BITUMINIOUS CONCRETE,INCLUDING  CLEANING OF ROAD SURFACE, PPLYING TACK COAT FOR DBM AND BC,… Continue reading CE (P) HIMANK/08/2020-21

CA NO CE (P)HMK/09/2020-21

PROVIDING LAYING AND COMPACTION OF 200 MM THICK CEMENTITIOUS BASE (CTB) OVER GSB SURFACE AND 10 MM THICK SAMI LAYER OVER PREPARED CTB LAYER IN ACCORDANCE WITH RELEVANT CLAUSES OF IRC 115-2014 IRC 37:2012/2018, IRC SP 89: (PART-II) 2010/2018 FOR SURFACING WORKS BETWEEN KM 0.00 TO KM 16.505 (NET LENGTH 16.505 KM) ON ROAD LUKUNG-PHOBRANG… Continue reading CA NO CE (P)HMK/09/2020-21

CA NO CE (P)HMK/14/2020-21

PROVIDING, LAYING AND COMPACTION OF 250MM THICK CEMENTITIOUS BASE (CTB) OVER GSB SURFACE INCLUDING PRIME COAT WITH BITUMEN EMULSION @7.5KG /10SQM  CONFORMING TO SECTION  502 OF MORTH SPECIFICATION (5TH REVISON ) AND 10 M THICK  SAMI LAYER OVER PREPARED CTB LAYER FOR SURFACING WORKS IN ACCORDANCE WITH RELEVANT CLAUSES OF IRC-37:2012/2018 AND ICP SP 89:… Continue reading CA NO CE (P)HMK/14/2020-21

CA CE (P)HMK/22/2019-20

PROVIDING AND LAYING OF 200 MM LAYER OF CEMENTITIOUS SUB BASE (CTSB) FINISHED INCLUDING PREPARATION OF SOIL BED FOR THE SURFACING WORKS IN  ACCORDANCE WITH RELEVANT CLAUSES OF IRC 37:2012/2018 AND  IRC-SP-89:2018 BETWEEN KM 43.00 TO KM 75.90 ON ROAD PHOBRANG-MARSIMKLA-HOTSPRING UNDER 51RCC/753 BRTF/HIMANK SECTOR IN J & K STATE

Project5

Risk and cost tender for providing, laying (with sensor pavers) and consolidation of readymade bituminous (hmp) mix- on batote kishtwar in j&k

Published
Categorized as gallery

Project4

Risk and cost tender for providing, laying (with sensor pavers) and consolidation of readymade bituminous (hmp) mix- on batote kishtwar in j&k