CA CE (P)ANK/09/2019-20

CA CE (P)ANK/09/2019-20

DESIGN PROVIDING AND LAYING OF SURF WRK INCLUDING CTB COVRED WITH SAMI LAYER OVER MECALLY CHISELD CLEANED CTB SURFCE DULY PRIMED WITH PRIME COAT AND BC40MM IN WITH RELEVANT CLAUSE IRC37 2018 AD IRC SP 89PARTII 2018 AT KM 0T0 KM 16 TCC MAZA. IN THE STATE OF ARUNACHAL PRADESH

Leave a comment

Your email address will not be published. Required fields are marked *

© 2022 LSR Infracon, designed by Webroot Technologies

back to top

LSR Infracon